|
Description: A revised and current comprehensive guide to Full-Depth Reclamation (FDR) using cement. FDR is a roadway rehabilitation process that recycles the materials from deteriorated asphalt pavement, and, with the addition of portland cement, creates a new stabilized base. The addition of a new concrete or bituminous riding surface completes the FDR process, providing a new roadway structure using recycled materials from the failed pavement.
This document describes the step-by-step process, from initial site investigation, to mix design, and construction. A recommended construction specification for FDR is included.
|