|
Description: This Project Information Sheet describes the use of Full-Depth Reclamation (FDR) with cement to upgrade unpaved roads in Fairfield County, SC. The construction process is a modification of that used to reclaim failed asphalt pavements. The existing surface of gravel and native soil was blended with cement and water and compacted, creating a new cement-stabilized base. The base then received a triple bituminous surface treatment (chip seal). This process saved the County $70,000 per mile, compared with construction of new asphalt pavement. Sold in packs of 25.
|