University of Colorado Health Sciences Center
Aurora, Colorado
Buildings Home > Case
Studies:Healthcare > University of Colorado Health Sciences Center
The
$13.5 Million cancer/urology center provides comprehensive services for
the outpatient care and treatment of cancer and urology patients. The
facility is a cast-in-place concrete frame building with a glass and brick
veneer exterior. The building houses multi-disciplinary activities
including outpatient exam and special procedure areas for cancer treatment
services; patient support services; and clinical investigation.
For the floor and roof structure of the 3-story building a 24-inch-deep,
wide module, or “skip-joist” concrete framing system was selected.
The floor and roof framing is supported by a combination of square
and exposed round concrete columns on a foundation of concrete
spread footings. Cast-in-place shearwalls on a mat foundation form the
wind and seismic lateral load resisting system. The typical building bay
size of 30 x 30 feet was pre-established by the owner and designed to
accommodate an additional future floor level.
The
first floor houses 3 linear accelerators that required rooms with concrete
walls and ceilings of varying widths up to 8 feet, 8 inches thick to shield
harmful radiation generated by the equipment. The main lobby
features a dramatic 3-story interior space. The adjacent upper floors
are set back from the exposed concrete columns with only the concrete
beams extending out to connect the floor to the columns.
A concrete floor system was ideal for the owner requirements of strict
vibration control criteria, heavy floor loads, and shallow floor depth
to provide ease and flexibility for M/E/P systems design and installation.
The inherent continuity of the cast-in-place concrete framing system provides
unparalleled vibration damping characteristics. The resulting
floors exhibit superior vibration control and fire resistance with no
additional costs or delays in schedule and occupancy. Forming
girder and beam soffits flush with the bottom of the joists simplified
and maximized the clearances for mechanical and electrical equipment.
They also afforded earlier project completion, and optimized total cost.
The project received the 2000 Award of Excellence from the American Concrete
Institute Rocky Mountain Chapter.
|
 |

Case Studies:
Cultural Buildings
Educational Institutions
Green Buildings
Healthcare
Hospitality
ICF Buildings
Luxury Residential
Mixed Use
Office Buildings
Religious Structures
Tilt-Up Buildings
|
Architects:
Perkins & Will; Davis Partnership, P.C.
Denver, CO
Structural Engineer:
S. A. Miro, Inc.,
Denver, CO
General Contractor:
Haselden Construction, Inc., Englewood, CO
Concrete Suppliers:
Aggregate Industries, Inc. Denver, CO
Suburban Reddi-Mix Arvada, CO
|
|
|