Moody Gardens Hotel, Houston, TexasThe Moody Gardens complex began almost two decades ago as a place where those with serious head injuries could go to receive hippotherapy at its riding arena and horse barn. Today it continues to serve as a therapy center for those with disabilities and has grown to include animal and horticulture research facilities. Drawing more than 2 million visitors annually to Galveston Island, it is one of Houston’s favorite tourist attractions. The entertainment complex features an aquarium, a museum, the Rainforest Pyramid, an IMAX theater, a 9-story hotel, and an artificial white-sand beach.

Moody Gardens Hotel, Houston, TexasA new hotel expansion was constructed to keep up with the ever growing needs of the rapidly expanding Moody Gardens complex. The $115 million Phase V expansion includes the new hotel tower, expansion of the existing hotel restaurant, an expansion and renovation of the convention center, a new 1,000-car cast-in-place post-tensioned parking garage, new maintenance and warehouse structures, expanded utility infrastructure, and other campus improvements.

The Phase V addition to the hotel adds a new 7-story plus basement structure and was designed for two floors of future expansion to eventually match the existing 9-story hotel building. The first floor consists of meeting rooms with numerous slab depressions required to accommodate the high end finishes. The complexity of this level, including ground walls framing into it, drove the decision to use a 10-inch-thick flat slab with mild reinforcing steel. The design team carefully considered the complex column layout and the small floor-to-floor heights required to match the 9-foot-8-inch existing floor heights. A post-tensioned cast-in-place flat plate system was the obvious choice for the hotel’s typical upper floors. Irregular and complex column layout resulted from the saw-tooth profile of the building designed to provide scenic picture windows and balconies that overlook the West Bay just off the Gulf of Mexico. The hotel frame consists of typical 8-inch two-way post-tensioned flat plate floors with 14 X 24-inch concrete columns and 12-inch-thick shear walls at the stair and elevator cores. The hotel also includes a single level basement, flood protected with 12-inch slab-on-grade concrete designed for 300 psf of buoyant uplift pressure and with flood gates at door openings.

Adding to the design challenges, all work had to be performed on a site congested with facilities that had to remain in operation during construction. The hotel was literally squeezed between the existing hotel, conference center, and pool deck that remained open year-round with the warm gulf coast climate. Construction Manager, Gilbane Building Company, phased construction to best accommodate Moody Gardens operations.

Moody Gardens Hotel, Houston, Texas With the Phase V expansion of the hotel, Moody Gardens met their lodging needs to serve their continued growth. The hotel was designed to enhance the quality of stay by providing scenic views and easy access to many of its other entertainment and educational facilities. Their continued attention to the total patron experience as well as their focus on research, therapy, and education will ensure that Moody Gardens will continue to be one of Houston’s most popular entertainment and educational attractions for years to come.





Case Studies:

Cultural Buildings
Educational Institutions
Green Buildings
Healthcare
Hospitality
ICF Buildings
Luxury Residential
Mixed Use
Office Buildings
Religious Structures
Tilt-Up Buildings


Owner:
Moody Gardens®

Architect:
Morris Architects

Structural and Civil Engineers:
Walter P. Moore

Contractor:
Gilbane Building Company

Concrete Contractor:
Baker Concrete Construction

Concrete Supplier:
Kelso Concrete Company

 
Careers | Sitemap | Disclaimer | Privacy Policy | © 2009 Portland Cement Association - All Rights Reserved