All photos by Erin O'Boyle Photographics/Courtesy of the Portland Cement Association

Bags of cement waiting to be added to a concrete mix for use at TNAH.
Image 21
(high res)

Concrete is placed for the TNAH's cantilevered deck over Lake Sahara.
Image 25
(high res)
Accessible from the kitchen and dining area of TNAH, a floating concrete deck under installation. Concrete panels are placed over a floating deck system. This system permits rainwater runoff beneath the surface decking area.
Image 23
(high res)


Concrete is smoothed out over the TNAH's cantilevered deck over Lake Sahara.
Image 24
high res

The primary exterior finish for TNAH is decorative concrete masonry.
Image 22
(high res)

Decorative aggregate is dusted over the concrete cantilevered deck.
Image 26
(high res)

Decorative aggregated is dusted over the concrete cantilevered deck.
Image 27
(high res)
Placed concrete is smoothed before adding decorative aggregate.
Image 28
(high res)
Decorative aggregated is dusted over the concrete cantilevered deck.
Image 29
(high res)
TNAH's upper deck features decorative stained concrete. Here, the staining process begins.
Image 30
(high res)
A decorative finish is applied on the TNAH's upper deck.
Image 31
(high res)
The staining process continues.
Image 32
(high res)

Construction images: 1 2