![]() |
|||
All photos by Erin O'Boyle Photographics/Courtesy of the Portland Cement Association |
|||
Bags of cement waiting to be added to a concrete mix for use at TNAH. |
Concrete is placed for the TNAH's cantilevered deck over Lake Sahara.
Image 25 (high res) |
Accessible
from the kitchen and dining area of TNAH, a floating concrete deck under
installation. Concrete panels are placed over a floating deck system.
This system permits rainwater runoff beneath the surface decking area. Image 23 (high res) |
|
Decorative
aggregated is dusted over the concrete cantilevered deck. Image 27 (high res) |
Placed
concrete is smoothed before adding decorative aggregate. Image 28 (high res) |
||
Decorative
aggregated is dusted over the concrete cantilevered deck. Image 29 (high res) |
TNAH's
upper deck features decorative stained concrete. Here, the staining process
begins. Image 30 (high res) |
A decorative
finish is applied on the TNAH's upper deck. Image 31 (high res) |
The staining
process continues. Image 32 (high res) |
Construction images: 1 2 |
|||